The visibility of masses can be controlled by the show mass setting of the view.
Revit only shows 2 floors but the building has 3.
Just for future reference when placing walls revit will default the base constraint to the level of the view you are in.
I am currently learning revit.
I need to look inside the building and place equipment on the first floor.
If you are in the level 3 plan view then the base constraint will be set to level 3.
Select the check box to display the linked model as an underlay in the project.
Select the check box to draw the linked model in halftone see halftone underlay.
The revit links tab in the visibility graphics dialog contains the following columns.
In the case of an annotation element the entire element must be within the annotation crop region to be visible.
Select the check box to show the linked model in the view or clear the check box to hide the linked model.
The top offset will default to the last used value e g.
It looks like my only option is to change my finish floor elevation to its actual height or the topo ends up 3400 above the building.
View 3 replies view related.
Or the site underneath the building as a link.
Here is an example.
It is a very hard program to learn imo.
3 element or category has is visible unchecked in right click override graphics in view 4 element is a mass and show mass form and floors has been turned off 5 element such as a section is set to hide at scales courser than 6 element has invisible lines linework placed on its edges 7 element s transparency has been set to 100.
On the first floor everything went okay as far as putting in walls but then when i go to the second floor i lose the wall patterns for some reason.
If you are in a level 1 view and set the top offset to level 2 the next.
Revit has multiple coordinate systems.
The issue is cutting an opening in an existing floor so that in only shows in a new phase i have created a floor based generic family with an opening tool and added an edge liner as a sweep.
The only time i ll model the site in the same file is if the building pretty much occupies 100 of the site and thus.
That sounds like a nasty little endless loop.
Hi so i m currently at the point where i have an underground level done with only the ramps from all other levels i started with that because i.